[ Contents | Search | Post | Reply | Next | Previous | Up ]
From: AC
Category: General Category
Remote Name: 65.161.0.82
Date: 05 Jan 2005
Time: 06:27:11 PM
I gotta think that once a 1000# + stack pops the structure on one side, the time it takes the off-balance stack to break the other side would be measured in milliseconds, and be pretty dang close to simultaneous. Although, and then again... I have seen where some of the wider structures over the last couple of years have compressed a bit on one side / leg and caused the crusher board to dip down far enough to cause imbalance. In fact, some of the "shorty" structures (that used to be legal) had problems where there wasn't enough clearance allowed between the structure height and the crusher board. (We always went for a 1/4 inch clearance, especially after seeing a few other teams that used less clearance "touch off" on the corner posts, thus ending their stacking.) I could be all wet here, but intuition tells me that the only difference will be a much louder BANG when the crusher board drops a whole 1.5"!! AC