From: Jake Zimmer
Category: OotM
Remote Name: 67.31.182.111
Date: 13 Mar 2004
Time: 07:19:37 PM
Already found that one out. I was just brain storming ideas for weigh-in devices. The intent of measuring the gap from what I have been told by WF is that it should be measurable at any time. The original intent of the problem was to have the structure hold the gap square but it was decided that we would run into problems with the weight of the gap square from state to state due to variations in materials with a given volume. It was then placed on the table for easier measurement. I just asked for clarification about the measurability of the gap last night so maybe that will help. You are correct that it will rest on the table -- I just missed clarification #3.